Concrete Structures Inspection: Layout and Grade

Form Template

Staking for layout and grade control should be done well in advance of the construction operations.

5,000 Companies save time and money with GoCanvas

Lumen Logo Post Consumer Brands Logo Saluda Hill Landscapes Logo Te3co Logo Two Men and a Truck Logo VIP Lighting Logo

Although the Department may often set the initial stakes, it is the Contractor’s responsibility to establish any string lines or other control systems to ensure that the structure is constructed to the correct line and grade. Regardless of who sets the stakes, they must be accurate or the structure will be in the wrong location and may have to be removed and replaced. As an inspector, you should inspect the layout and grade controls in advance. Go Green with GoCanvas!

Enhance your staking process and try our

survey staking work plan mobile app.

Features
  • Submission Editing
  • Reference Data
  • Dispatch
Read More
Platforms
  • iPhone
  • iPad
  • Android
  • Windows
Read More
Integrations
  • Quickbooks
  • Salesforce
  • Google Docs
  • Dropbox
Read More
*The Capterra SoftwareAdvice ​and GetApp logos are a service mark of Gartner, Inc. and/or its affiliates and is used herein with permission.*

Don't take our word for it...

“I’m not a tech guy and I was able to pick this thing up in probably an hour, and actually start to build apps. I’ve done them over lunch when I’ve gotten frustrated with a process that didn’t exist in our company. So for non tech people who’ve got a problem, the support here is awesome and I’d recommend it to anybody, not just in our industry.”

Dave Kramer, PennLine Service

Connect with one of our experts today.

We’ll help you put together the right solution for your needs.

Contact Us