ENERGY STAR Qualified Homes V3 Water Management System Builder Checklist - Colorado

Form Template

Use the specifications in this Checklist to improve moisture control in new Colorado homes compared with homes built to minimum code.

5,000 Companies save time and money with GoCanvas

Lumen Logo Post Consumer Brands Logo Saluda Hill Landscapes Logo Te3co Logo Two Men and a Truck Logo VIP Lighting Logo

Note: when performing an inspection, tamping of back-fill is not required if either: proper drainage can be achieved using non-settling compact soils, as determined by a certified hydrologist, soil scientist, or engineer; OR, the builder has scheduled a site visit to provide in-fill and final grading after settling has occurred (e.g., after the first rainy season). This Checklist can be customized to comply with Colorado state and local regulations.

Features
  • Signature Capture
  • Submission Editing
  • Reference Data
  • Dispatch
Read More
Platforms
  • iPhone
  • iPad
  • Android
  • Windows
Read More
Integrations
  • Quickbooks
  • Salesforce
  • Google Docs
  • Dropbox
Read More
*The Capterra SoftwareAdvice ​and GetApp logos are a service mark of Gartner, Inc. and/or its affiliates and is used herein with permission.*

Don't take our word for it...

“I’m not a tech guy and I was able to pick this thing up in probably an hour, and actually start to build apps. I’ve done them over lunch when I’ve gotten frustrated with a process that didn’t exist in our company. So for non tech people who’ve got a problem, the support here is awesome and I’d recommend it to anybody, not just in our industry.”

Dave Kramer, PennLine Service

Connect with one of our experts today.

We’ll help you put together the right solution for your needs.

Contact Us