ENERGY STAR Qualified Homes V3 Water Management System Builder Checklist - New Mexico
Form Template
Use the specifications in this Checklist to help improve moisture control in brand-new New Mexico homes.
5,000 Companies save time and money with GoCanvas
When inspecting water-managed site and foundations, where setbacks limit space to less than 10 ft., swales or drains designed to carry water from foundation shall be provided. Also, tamping of back-fill is not required if either: proper drainage can be achieved using non-settling compact soils, as determined by a certified hydrologist, soil scientist, or engineer; OR, the builder has scheduled a site visit to provide in-fill and final grading after settling has occurred (e.g., after the first rainy season). This entire Checklist can be modified as necessary to comply with New Mexico state and local regulations.
Not quite right?
GoCanvas accounts come
with hundreds of form templates
Don't take our word for it...
“I’m not a tech guy and I was able to pick this thing up in probably an hour, and actually start to build apps. I’ve done them over lunch when I’ve gotten frustrated with a process that didn’t exist in our company. So for non tech people who’ve got a problem, the support here is awesome and I’d recommend it to anybody, not just in our industry.”