Slurry Inspection: Inspection and Maintenance Guidelines
This guidance provides basic design specification, operation and maintenance guidelines for containment slurry walls.
5,000 Companies save time and money with GoCanvas
Slurry walls are used as an engineering control to prevent groundwater and non-aqueous phase liquids (NAPL) migration and/or maintain separation between contaminated and uncontaminated groundwater regimes. This guidance does not intend to provide comprehensive instruction or direction on remedy selection, site-wide feasibility assessment, exposure, or risk assessment. A plan for operation, maintenance, and monitoring should be submitted for review and approval for all sites proposing engineering controls, including slurry walls. The plan may be submitted as part of a work plan (i.e., corrective action plan, remediation work plan) or as a stand-alone document. Use the Slurry Inspection: Inspection and Maintenance Guidelines mobile app as a primary mechanism for long term management of the slurry wall. Do you need several apps with common functionality. Create a template and then use it to create new apps.
GoCanvas accounts come
with hundreds of form templates
Don't take our word for it...
“I’m not a tech guy and I was able to pick this thing up in probably an hour, and actually start to build apps. I’ve done them over lunch when I’ve gotten frustrated with a process that didn’t exist in our company. So for non tech people who’ve got a problem, the support here is awesome and I’d recommend it to anybody, not just in our industry.”