NORM Field Sampling Plan: Protocol for Conventional & Unconventional Cuttings from a Pit
Form Template
Sampling and analysis should be completed for every 1000 cubic yards of material (cuttings) or per well, whichever is more frequent and at least four discreet samples per well.
5,000 Companies save time and money with GoCanvas
The cuttings will be sampled from the on-site pit. Separate or discrete samples will be taken to represent Brine, Pyritic, or Petroleum formations encountered within the drilling. Use the NORM Field Sampling Plan: Protocol for Conventional & Unconventional Cuttings from a Pit mobile app to ensure your field sampling is safe and compliant while taking samples from a pit.
Not quite right?
GoCanvas accounts come
with hundreds of form templates
Don't take our word for it...
“I’m not a tech guy and I was able to pick this thing up in probably an hour, and actually start to build apps. I’ve done them over lunch when I’ve gotten frustrated with a process that didn’t exist in our company. So for non tech people who’ve got a problem, the support here is awesome and I’d recommend it to anybody, not just in our industry.”