Guide Tunnelling (Australia): Specific Hazards, Risks and Control Measures – Drill and Blast
Form Template
Where drill and blast operations are to be used specific SWMSs must be developed to cover the complete work process.
5,000 Companies save time and money with GoCanvas
Control measures should be implemented to eliminate or minimise, so far as is reasonably practicable, the risks associated with excavation by drill and blast. Some control measures to consider are provided in the Guide Tunnelling (Australia): Specific Hazards, Risks and Control Measures – Drill and Blast mobile app. This app is part of a collection of Guide Tunnelling (Australia) apps. Download them all for free!
Not quite right?
GoCanvas accounts come
with hundreds of form templates
Don't take our word for it...
“I’m not a tech guy and I was able to pick this thing up in probably an hour, and actually start to build apps. I’ve done them over lunch when I’ve gotten frustrated with a process that didn’t exist in our company. So for non tech people who’ve got a problem, the support here is awesome and I’d recommend it to anybody, not just in our industry.”