Stormwater Management Pond Plan Review Checklist
Use the Stormwater Management Pond Plan Review Checklist mobile app as part of your Stormwater Management Pond Plan.
5,000 Companies save time and money with GoCanvas
The app records the Sediment Control Permit No. and checks the following areas of your plan: hydrology, assorted computations, geological investigation, plan view of pond at scale of 1” = 50’ or less (40’, 30’, etc.), general items, maintenance items, landscaping / multiple use / aesthetic considerations, principal spillway profile and associated details, existing and proposed ground, foundation cutoff (core trench), impervious core (zoned fill / embankment core), barrel, riser or similar structure (specific detail required), orifice(s) and trash racks (detail required), pond drain (for wet ponds only),anti-seep collars (detail required), outfall protection (detail required), elevations: (includes required freeboard), profile section of dam along centerline, emergency spillway profile along centerline and miscellaneous items.
GoCanvas accounts come
with hundreds of form templates
Don't take our word for it...
“I’m not a tech guy and I was able to pick this thing up in probably an hour, and actually start to build apps. I’ve done them over lunch when I’ve gotten frustrated with a process that didn’t exist in our company. So for non tech people who’ve got a problem, the support here is awesome and I’d recommend it to anybody, not just in our industry.”