Tiling Pre Construction Safety Checklist
Form Template
As with all GoCanvas applications, the Tiling Pre Construction Safety Checklist mobile app generates a secure PDF that is stored in the GoCanvas Cloud for your construction records and can easily be integrated into your tiling paperless data collection system.
5,000 Companies save time and money with GoCanvas
The checklist can also serve as documentation of your tiling pre construction records. The Tiling Pre Construction Safety Checklist provides a basic checklist but it can be customized to meet your tiling business needs and requirements and document items such as, contract number, tiling jobsite location, safety briefing checklist and tiling subcontractor's signature.
Not quite right?
GoCanvas accounts come
with hundreds of form templates
Don't take our word for it...
“I’m not a tech guy and I was able to pick this thing up in probably an hour, and actually start to build apps. I’ve done them over lunch when I’ve gotten frustrated with a process that didn’t exist in our company. So for non tech people who’ve got a problem, the support here is awesome and I’d recommend it to anybody, not just in our industry.”