Construction of Drainage Pits Safe Work Method Statement (SWMS) (Australia) (New Zealand)
Form Template
At times, construction workers may need to excavate for pits, prepare bases, install pre-cast pit or construct pit on site.
5,000 Companies save time and money with GoCanvas
The Construction of Drainage Pits Safe Work Method Statement (SWMS) (Australia) (New Zealand) app provides a risk assessment for that excavation work. This Safe Work Procedure is applicable to the construction of pre-cast concrete and cast in-situ storm water drainage pits. The app rates critical tasks within excavation work from low risk to high risk and also lists potential hazards that could arise. Additionally, the app provides suggested personal protective equipment and risk controls/safety control measures to improve health and safety on the job site.
Not quite right?
GoCanvas accounts come
with hundreds of form templates
Don't take our word for it...
“I’m not a tech guy and I was able to pick this thing up in probably an hour, and actually start to build apps. I’ve done them over lunch when I’ve gotten frustrated with a process that didn’t exist in our company. So for non tech people who’ve got a problem, the support here is awesome and I’d recommend it to anybody, not just in our industry.”