Checklist for Paving
Many construction projects involve concrete paving and numerous pavement jobs.
5,000 Companies save time and money with GoCanvas
The Checklist for Paving app is a useful checklist that offers a thorough set of guidelines to accomplish before paving and after paving. The checklist covers important materials and standard specifications. Before paving tasks include things such as: ensure that asphalt contractors and producers are all on the approved lists provided annually by the lab, remind the contractor to implement the paving policy and procedures received in the pre-construction meeting, etc. Tasks to consider during paving include: observe arriving loads for proper mix size, minimal segregation, consistent color, and being tarp covered, collect and check asphalt delivery tickets for correct information (project name, mix ID, tonnage, time, etc.) check HMA temperature while being loaded into the paver, and/or behind the roller, after its first pass, etc.
GoCanvas accounts come
with hundreds of form templates
Don't take our word for it...
“I’m not a tech guy and I was able to pick this thing up in probably an hour, and actually start to build apps. I’ve done them over lunch when I’ve gotten frustrated with a process that didn’t exist in our company. So for non tech people who’ve got a problem, the support here is awesome and I’d recommend it to anybody, not just in our industry.”