Bridge Deck Concrete Placement Checklist
Before bridge construction, it is important to follow special provisions for creating a sturdy bridge deck.
5,000 Companies save time and money with GoCanvas
It is required that a pre-pour meeting with the contractor be scheduled to specifically discuss: time of starting of pour, anticipated weather conditions, anticipated rate of delivery of concrete, how much material will be needed, discuss pouring sequence concerns, curing requirements, skew placement concerns, method of placement of the deck concrete, etc. The Bridge Deck Concrete Placement Checklist app contains a full list of standard specifications for bridge construction. The checklist items cover topics on concrete slab, project design, and building structure. Check out the Bridge Deck Concrete Placement Checklist app for the full list.
GoCanvas accounts come
with hundreds of form templates
Don't take our word for it...
“I’m not a tech guy and I was able to pick this thing up in probably an hour, and actually start to build apps. I’ve done them over lunch when I’ve gotten frustrated with a process that didn’t exist in our company. So for non tech people who’ve got a problem, the support here is awesome and I’d recommend it to anybody, not just in our industry.”