Streamlining Operations: How TAS Energy Achieved a 60% Drop in Errors and 50% Faster Reports with GoCanvas

TAS Logo

Industry: Engineering, Manufacturing, Energy

HQ Location: Houston, TX

Website: Visit Here

Overview

Overview

TAS Energy, a leading player in the energy sector, has revolutionized its operations and project management with GoCanvas integration. This case study explores TAS Energy’s journey, highlighting the challenges the company faced, the solutions it implemented, and the outcomes achieved with GoCanvas.

Stefan Barcik, operations product executive manager at TAS Energy, has been utilizing GoCanvas for roughly six years, with a strong endorsement from TAS Energy’s project management team. Stefan’s role involves managing TAS Energy’s entire supply chain, facilitating interdepartmental communications, and ensuring the smooth movement of parts and pieces essential for company operations, while the project management team is responsible for extensive scheduling, design reviews, planning, and ensuring all team members are aligned on project goals.

Problem

Problem

Stefan faced significant challenges in accurately representing project needs due to poor estimation and planning. This led to reactivity, rework, and time overruns, which caused financial strain. Stefan’s team struggled with data collection on the shop floor, quality inspections, and inefficient workflows, which hampered their ability to make informed decisions and maintain project timelines.

60%

reduction in documentation errors

50%

reduction in reporting duration

The Solution

The Solution

The lightbulb moment for Stefan came when TAS Energy realized the need for a better data collection system on the shop floor. The company implemented GoCanvas to streamline quality inspections, checklists, and workflows, driven originally by forms and later expanded for broader use cases. GoCanvas reduced documentation errors, thereby enhancing data mining, and speeding up processes.

The Outcomes

The Outcomes

Adopting GoCanvas brought transformative changes to TAS Energy. GoCanvas enabled a significant (60%) reduction in documentation errors, decreased reporting duration by 50%, and improved overall data collection – to align with rapid decisionmaking processes. This transformation was eye-opening for Stefan’s VP, who commented on the large positive impact it had on the organization.

By integrating GoCanvas, TAS Energy has set a benchmark for operational efficiency and project management excellence, showcasing the transformative power of the right technology in driving business success.

Ready to Rethink How You Work?

GoCanvas has helped a variety of businesses across multiple industries transform their safety processes and rethink their efficiency, ultimately saving them money. Why not do the same? Reach out to one of our experts today to kickstart your process revolution.

Check out even more resources

Three inspection workers on job site.

The Ultimate Guide to Quality Control Inspections

Managing a construction project is a complex and stressful process. Among other things, you have to coordinate project team members, materials, and equipment and ensure that contractors are not afflicted by the potential risks and hazards present at the construction site. That said, quality means different things to different people which is why you should…

A man using GoCanvas for the digital transformation of his workflow.

Constructions Digital Transformation

Your competition is finding faster ways to capture data and get critical insights from the field into their existing systems. In short, they’re not going bigger, they’re getting smarter. In this 15-minute broadcast on the construction industry’s digital transformation, find out why the trend is to modernize workflows – and how you can stay ahead of the curve…

A electrician inspecting equipment.

See how VIP Lighting optimized efficiency with GoCanvas

VIP Lighting is a retail lighting and electrical maintenance business that services over 10,000 retail locations all over Australia and New Zealand. Before GoCanvas, VIP Lighting had two separate systems that were impossible to integrate, leading to inefficiencies. GoCanvas made it easy to integrate their systems into single, centralized platform…